I can't figure out how to exclude this last point on the spline from the Selection
of Instance on Points
. I thought Factor
was a value between 0
& 1
, but it turns out it isn't when i read the documentation. I'm not quite sure i fully understood the documentation but it seems that Factor
is the portion length in meters
to control point so that would mean that Factor
divided by total Length
should result in a value within the range of 0
to 1
, am i mistaken? So assuming it was 1 for whole length or even lesser like 0.8
i would expect that a comparison of less than these values would exclude the last point.
UPDATE:
It somehow works now if i use a hard-coded integer value of 3 but if i plug a value that also has a value of 3 inside, it destroys my plant output. I also tried float to integer converter and still doesn't work. Weird bug?